No. | Subject | Course | Topic | User Category | Telecast Date / Day | Telecast Time | Repeat Time |
---|---|---|---|---|---|---|---|
1 | Engineering | Electrical Engineering | to Electrical Engineering | 08:00:00 - 08:59:33 || | |||
2 | Engineering | and Communication | Equivalence between Optimal HR Policyand optimal Markov Deterministic Policy | 08:59:33 - 09:28:24 || | |||
3 | Engineering | and Communication | Stochastic Control under incomplete state information | 09:28:24 - 09:59:35 || | |||
4 | Codes | the MPF Problem | 09:59:35 - 10:59:47 || | ||||
5 | Systems | Controller Design | 10:59:47 - 11:59:56 || | ||||
6 | Engineering | Networks | Tapestry Protocol through Example | 11:59:56 - 12:59:53 || | |||
7 | Engineering | Controllability and Observability | 12:59:53 - 14:04:21 || | ||||
8 | Engineering | for mm Wave communication for 5G and beyond | Coherence time and parameter summery | 14:04:21 - 14:35:05 || | |||
9 | Engineering | for mm Wave communication for 5G and beyond | ISI channel | 14:35:05 - 15:07:03 || | |||
10 | Engineering | Electric vehicles: Technology & Economics | Battery Parameters -Part 1 | 15:07:03 - 15:28:14 || | |||
11 | Engineering | Electric vehicles: Technology & Economics | Battery Parameters - Part 2 | 15:28:14 - 15:59:40 || | |||
12 | Technology | 15:59:40 - 17:00:56 || | |||||
13 | Engineering | Electronic Converters | Electronics | 17:00:56 - 17:27:42 || | |||
14 | Engineering | Electronic Converters | Noise | 17:27:42 - 17:59:35 || | |||
15 | Fields | Vector ( Continued) | 17:59:35 - 18:59:36 || | ||||
16 | Instrumentation | Flowmeter III | 18:59:36 - 19:59:40 || | ||||
17 | Engineering | I | Phase Transformer | 19:59:40 - 20:59:50 || | |||
18 | Engineering | Circuit | Semiconductor Light Emitting Diodes cont. | 20:59:50 - 21:59:52 || | |||
19 | Systems | Functions | 21:59:52 - 22:59:40 || | ||||
20 | Engineering | and the Theory of Queues | Large Numbers and Central Limit Theorem | 22:59:40 - 23:28:06 || | |||
21 | Engineering | and the Theory of Queues | stochastic process? | 23:28:06 - 23:38:58 || | |||
22 | Engineering | and the Theory of Queues | Process | 23:38:58 - 23:59:56 || | |||
23 | Engineering | Techniques-1 | 23:59:56 - 00:29:59 || | ||||
24 | Engineering | Techniques-2 | 00:29:59 - 00:59:51 (2024-11-26) || | ||||
25 | circuits | FET & BJT Characteristics and Biasing | 00:59:51 - 01:59:34 (2024-11-26) || | ||||
26 | Power Electronics | Converter-Design | 01:59:34 - 02:59:54 (2024-11-26) || | ||||
27 | Oscillator | 02:59:54 - 03:59:41 (2024-11-26) || | |||||
28 | Dynamic Control | Time Invariant Dynamical Systems (Contd.) | 03:59:41 - 04:59:43 (2024-11-26) || | ||||
29 | Engineering | Analog Designers | Line Driven By A Source, Power In A Transmission Line | 04:59:43 - 05:59:49 (2024-11-26) || | |||
30 | and Distributed Generation | initial cost | 05:59:49 - 06:59:38 (2024-11-26) || | ||||
31 | Regression; LMS algorithm | 06:59:38 - 08:00:00 (2024-11-26) || | |||||
32 | Engineering | 08:00:00 - 08:25:12 || | |||||
33 | Engineering | 08:25:12 - 08:59:47 || | |||||
34 | circuits | Small Signal Models | 08:59:47 - 09:59:43 || | ||||
35 | Power Electronics | Converter - Simulation study | 09:59:43 - 10:59:47 || | ||||
36 | 10:59:47 - 11:59:37 || | ||||||
37 | Dynamic Control | Time Scale Modeling | 11:59:37 - 12:59:42 || | ||||
38 | Engineering | Analog Designers | Chart | 12:59:42 - 13:39:46 || | |||
39 | Engineering | Analog Designers | Scattering Parameters | 13:39:46 - 13:59:42 || | |||
40 | and Distributed Generation | inverters | 13:59:42 - 14:59:50 || | ||||
41 | algorithm; General nonliner least-squares regression | 14:59:50 - 15:59:57 || | |||||
42 | Engineering | Electrical Engineering | to Electrical Engineering | 15:59:57 - 17:00:00 || | |||
43 | Engineering | and Communication | Equivalence between Optimal HR Policyand optimal Markov Deterministic Policy | 17:00:00 - 17:28:51 || | |||
44 | Engineering | and Communication | Stochastic Control under incomplete state information | 17:28:51 - 17:59:32 || | |||
45 | Codes | the MPF Problem | 17:59:32 - 18:59:44 || | ||||
46 | Systems | Controller Design | 18:59:44 - 19:59:53 || | ||||
47 | Engineering | Networks | Tapestry Protocol through Example | 19:59:53 - 20:59:50 || | |||
48 | Engineering | Controllability and Observability | 20:59:50 - 22:04:18 || | ||||
49 | Engineering | for mm Wave communication for 5G and beyond | Coherence time and parameter summery | 22:04:18 - 22:35:02 || | |||
50 | Engineering | for mm Wave communication for 5G and beyond | ISI channel | 22:35:02 - 23:07:00 || | |||
51 | Engineering | Electric vehicles: Technology & Economics | Battery Parameters -Part 1 | 23:07:00 - 23:28:11 || | |||
52 | Engineering | Electric vehicles: Technology & Economics | Battery Parameters - Part 2 | 23:28:11 - 23:59:37 || | |||
53 | Technology | 23:59:37 - 01:00:53 || | |||||
54 | Engineering | Electronic Converters | Electronics | 01:00:53 - 01:27:39 (2024-11-27) || | |||
55 | Engineering | Electronic Converters | Noise | 01:27:39 - 01:59:32 (2024-11-27) || | |||
56 | Fields | Vector ( Continued) | 01:59:32 - 02:59:33 (2024-11-27) || | ||||
57 | Instrumentation | Flowmeter III | 02:59:33 - 03:59:37 (2024-11-27) || | ||||
58 | Engineering | I | Phase Transformer | 03:59:37 - 04:59:47 (2024-11-27) || | |||
59 | Engineering | Circuit | Semiconductor Light Emitting Diodes cont. | 04:59:47 - 05:59:49 (2024-11-27) || | |||
60 | Systems | Functions | 05:59:49 - 06:59:37 (2024-11-27) || | ||||
61 | Engineering | and the Theory of Queues | Large Numbers and Central Limit Theorem | 06:59:37 - 07:28:03 (2024-11-27) || | |||
62 | Engineering | and the Theory of Queues | stochastic process? | 07:28:03 - 07:38:55 (2024-11-27) || | |||
63 | Engineering | and the Theory of Queues | Process | 07:38:55 - 08:00:00 (2024-11-27) || | |||
64 | Technology | 08:00:00 - 08:59:45 || | |||||
65 | Engineering | Electronic Converters | Solutions Of EMI | 08:59:45 - 09:27:06 || | |||
66 | Engineering | Electronic Converters | I | 09:27:06 - 09:59:43 || | |||
67 | Fields | 09:59:43 - 10:59:45 || | |||||
68 | Instrumentation | Flowmeter IV | 10:59:45 - 11:59:48 || | ||||
69 | Engineering | I | Machine | 11:59:48 - 13:00:00 || | |||
70 | Engineering | Circuit | Semiconductor Lasers | 13:00:00 - 13:59:59 || | |||
71 | Control Systems | 13:59:59 - 15:05:24 || | |||||
72 | Engineering | and the Theory of Queues | Process-Introduction | 15:05:24 - 15:28:56 || | |||
73 | Engineering | and the Theory of Queues | Process-Memorylessness | 15:28:56 - 15:59:46 || | |||
74 | Engineering | 15:59:46 - 16:24:58 || | |||||
75 | Engineering | 16:24:58 - 16:59:33 || | |||||
76 | circuits | Small Signal Models | 16:59:33 - 17:59:59 || | ||||
77 | Power Electronics | Converter - Simulation study | 17:59:59 - 18:59:33 || | ||||
78 | 18:59:33 - 19:59:53 || | ||||||
79 | Dynamic Control | Time Scale Modeling | 19:59:53 - 20:59:58 || | ||||
80 | Engineering | Analog Designers | Chart | 20:59:58 - 21:40:02 || | |||
81 | Engineering | Analog Designers | Scattering Parameters | 21:40:02 - 21:59:58 || | |||
82 | and Distributed Generation | inverters | 21:59:58 - 22:59:36 || | ||||
83 | algorithm; General nonliner least-squares regression | 22:59:36 - 23:59:53 || | |||||
84 | Engineering | Electrical Engineering | to Electrical Engineering | 23:59:53 - 00:59:56 || | |||
85 | Engineering | and Communication | Equivalence between Optimal HR Policyand optimal Markov Deterministic Policy | 00:59:56 - 01:28:47 (2024-11-28) || | |||
86 | Engineering | and Communication | Stochastic Control under incomplete state information | 01:28:47 - 01:59:58 (2024-11-28) || | |||
87 | Codes | the MPF Problem | 01:59:58 - 02:59:40 (2024-11-28) || | ||||
88 | Systems | Controller Design | 02:59:40 - 03:59:49 (2024-11-28) || | ||||
89 | Engineering | Networks | Tapestry Protocol through Example | 03:59:49 - 04:59:46 (2024-11-28) || | |||
90 | Engineering | Controllability and Observability | 04:59:46 - 06:04:14 (2024-11-28) || | ||||
91 | Engineering | for mm Wave communication for 5G and beyond | Coherence time and parameter summery | 06:04:14 - 06:34:58 (2024-11-28) || | |||
92 | Engineering | for mm Wave communication for 5G and beyond | ISI channel | 06:34:58 - 07:06:56 (2024-11-28) || | |||
93 | Engineering | Electric vehicles: Technology & Economics | Battery Parameters -Part 1 | 07:06:56 - 07:28:07 (2024-11-28) || | |||
94 | Engineering | Electric vehicles: Technology & Economics | Battery Parameters - Part 2 | 07:28:07 - 08:00:00 (2024-11-28) || | |||
95 | Engineering | Electrical Engineering | to Electrical Engineering | 08:00:00 - 08:59:33 || | |||
96 | Engineering | and Communication | Stochastic Control under incomplete state information (Continued) | 08:59:33 - 09:29:08 || | |||
97 | Engineering | and Communication | Stochastic Control under incomplete state information: Example | 09:29:08 - 09:59:38 || | |||
98 | Codes | 09:59:38 - 10:59:48 || | |||||
99 | Systems | Controller Design I | 10:59:48 - 11:59:42 || | ||||
100 | Engineering | Networks | Distributed Hash Table: Mapping of Peers into Multidimensional Space | 11:59:42 - 12:23:12 || | |||
101 | Engineering | Networks | Design for Multiple Services | 12:23:12 - 12:59:40 || | |||
102 | Engineering | 12:59:40 - 14:04:00 || | |||||
103 | Engineering | for mm Wave communication for 5G and beyond | estimation and Equalizer | 14:04:00 - 14:34:09 || | |||
104 | Engineering | for mm Wave communication for 5G and beyond | and MIMO | 14:34:09 - 15:03:24 || | |||
105 | Engineering | Electric vehicles: Technology & Economics | Battery? - Part 1 | 15:03:24 - 15:34:07 || | |||
106 | Engineering | Electric vehicles: Technology & Economics | Battery? - Part 2 | 15:34:07 - 15:59:49 || | |||
107 | Technology | 15:59:49 - 16:59:34 || | |||||
108 | Engineering | Electronic Converters | Solutions Of EMI | 16:59:34 - 17:26:55 || | |||
109 | Engineering | Electronic Converters | I | 17:26:55 - 17:59:32 || | |||
110 | Fields | 17:59:32 - 18:59:34 || | |||||
111 | Instrumentation | Flowmeter IV | 18:59:34 - 19:59:37 || | ||||
112 | Engineering | I | Machine | 19:59:37 - 20:59:49 || | |||
113 | Engineering | Circuit | Semiconductor Lasers | 20:59:49 - 21:59:48 || | |||
114 | Control Systems | 21:59:48 - 23:05:13 || | |||||
115 | Engineering | and the Theory of Queues | Process-Introduction | 23:05:13 - 23:28:45 || | |||
116 | Engineering | and the Theory of Queues | Process-Memorylessness | 23:28:45 - 23:59:35 || | |||
117 | Engineering | 23:59:35 - 00:24:47 || | |||||
118 | Engineering | 00:24:47 - 00:59:52 (2024-11-29) || | |||||
119 | circuits | Small Signal Models | 00:59:52 - 01:59:48 (2024-11-29) || | ||||
120 | Power Electronics | Converter - Simulation study | 01:59:48 - 02:59:52 (2024-11-29) || | ||||
121 | 02:59:52 - 03:59:42 (2024-11-29) || | ||||||
122 | Dynamic Control | Time Scale Modeling | 03:59:42 - 04:59:47 (2024-11-29) || | ||||
123 | Engineering | Analog Designers | Chart | 04:59:47 - 05:39:51 (2024-11-29) || | |||
124 | Engineering | Analog Designers | Scattering Parameters | 05:39:51 - 05:59:47 (2024-11-29) || | |||
125 | and Distributed Generation | inverters | 05:59:47 - 06:59:55 (2024-11-29) || | ||||
126 | algorithm; General nonliner least-squares regression | 06:59:55 - 08:00:00 (2024-11-29) || | |||||
127 | Engineering | Time Domain-1 | 08:00:00 - 08:27:27 || | ||||
128 | Engineering | Time Domain-2 | 08:27:27 - 08:59:48 || | ||||
129 | circuits | Amplifiers: Mid Frequency Analysis | 08:59:48 - 09:59:33 || | ||||
130 | Power Electronics | Control - Introduction | 09:59:33 - 10:59:32 || | ||||
131 | Phase Locked Loop | 10:59:32 - 11:59:32 || | |||||
132 | Dynamic Control | Integration | 11:59:32 - 12:59:47 || | ||||
133 | Engineering | Analog Designers | Parameters : Introduction | 12:59:47 - 13:19:26 || | |||
134 | Engineering | Analog Designers | Scattering Matrix Calculations | 13:19:26 - 13:59:42 || | |||
135 | and Distributed Generation | voltage source inverter | 13:59:42 - 14:59:42 || | ||||
136 | Statistics of least squares method; Regularized Least Squares | 14:59:42 - 15:59:54 || | |||||
137 | Engineering | Electrical Engineering | to Electrical Engineering | 15:59:54 - 16:59:57 || | |||
138 | Engineering | and Communication | Stochastic Control under incomplete state information (Continued) | 16:59:57 - 17:29:32 || | |||
139 | Engineering | and Communication | Stochastic Control under incomplete state information: Example | 17:29:32 - 17:59:32 || | |||
140 | Codes | 17:59:32 - 18:59:42 || | |||||
141 | Systems | Controller Design I | 18:59:42 - 19:59:36 || | ||||
142 | Engineering | Networks | Distributed Hash Table: Mapping of Peers into Multidimensional Space | 19:59:36 - 20:23:06 || | |||
143 | Engineering | Networks | Design for Multiple Services | 20:23:06 - 20:59:34 || | |||
144 | Engineering | 20:59:34 - 22:03:54 || | |||||
145 | Engineering | for mm Wave communication for 5G and beyond | estimation and Equalizer | 22:03:54 - 22:34:03 || | |||
146 | Engineering | for mm Wave communication for 5G and beyond | and MIMO | 22:34:03 - 23:03:18 || | |||
147 | Engineering | Electric vehicles: Technology & Economics | Battery? - Part 1 | 23:03:18 - 23:34:01 || | |||
148 | Engineering | Electric vehicles: Technology & Economics | Battery? - Part 2 | 23:34:01 - 23:59:43 || | |||
149 | Technology | 23:59:43 - 00:59:58 || | |||||
150 | Engineering | Electronic Converters | Solutions Of EMI | 00:59:58 - 01:27:19 (2024-11-30) || | |||
151 | Engineering | Electronic Converters | I | 01:27:19 - 01:59:56 (2024-11-30) || | |||
152 | Fields | 01:59:56 - 02:59:58 (2024-11-30) || | |||||
153 | Instrumentation | Flowmeter IV | 02:59:58 - 04:00:01 (2024-11-30) || | ||||
154 | Engineering | I | Machine | 04:00:01 - 04:59:43 (2024-11-30) || | |||
155 | Engineering | Circuit | Semiconductor Lasers | 04:59:43 - 05:59:42 (2024-11-30) || | |||
156 | Control Systems | 05:59:42 - 07:05:07 (2024-11-30) || | |||||
157 | Engineering | and the Theory of Queues | Process-Introduction | 07:05:07 - 07:28:39 (2024-11-30) || | |||
158 | Engineering | and the Theory of Queues | Process-Memorylessness | 07:28:39 - 08:00:00 (2024-11-30) || | |||
159 | Technology | 08:00:00 - 09:00:03 || | |||||
160 | Engineering | Electronic Converters | Ii | 09:00:03 - 09:24:23 || | |||
161 | Engineering | Electronic Converters | Power Converters | 09:24:23 - 10:08:22 || | |||
162 | Fields | 10:08:22 - 11:05:11 || | |||||
163 | Instrumentation | Flowmeter V | 11:05:11 - 12:05:23 || | ||||
164 | Engineering | I | Generator/Motor Operation | 12:05:23 - 12:59:59 || | |||
165 | Engineering | Circuit | Semiconductor photodetector | 12:59:59 - 13:59:41 || | |||
166 | 13:59:41 - 15:04:01 || | ||||||
167 | Engineering | and the Theory of Queues | Process-Increment properties | 15:04:01 - 15:22:16 || | |||
168 | Engineering | and the Theory of Queues | of arrival epoch Sn and N(t) for a Poisson Process | 15:22:16 - 15:59:56 || | |||
169 | Engineering | Time Domain-1 | 15:59:56 - 16:27:23 || | ||||
170 | Engineering | Time Domain-2 | 16:27:23 - 16:59:44 || | ||||
171 | circuits | Amplifiers: Mid Frequency Analysis | 16:59:44 - 17:59:59 || | ||||
172 | Power Electronics | Control - Introduction | 17:59:59 - 18:59:58 || | ||||
173 | Phase Locked Loop | 18:59:58 - 19:59:58 || | |||||
174 | Dynamic Control | Integration | 19:59:58 - 20:59:43 || | ||||
175 | Engineering | Analog Designers | Parameters : Introduction | 20:59:43 - 21:19:22 || | |||
176 | Engineering | Analog Designers | Scattering Matrix Calculations | 21:19:22 - 21:59:38 || | |||
177 | and Distributed Generation | voltage source inverter | 21:59:38 - 22:59:38 || | ||||
178 | Statistics of least squares method; Regularized Least Squares | 22:59:38 - 00:00:00 || | |||||
179 | Engineering | Electrical Engineering | to Electrical Engineering | 00:00:00 - 00:59:33 (2024-12-01) || | |||
180 | Engineering | and Communication | Stochastic Control under incomplete state information (Continued) | 00:59:33 - 01:29:08 (2024-12-01) || | |||
181 | Engineering | and Communication | Stochastic Control under incomplete state information: Example | 01:29:08 - 01:59:38 (2024-12-01) || | |||
182 | Codes | 01:59:38 - 02:59:48 (2024-12-01) || | |||||
183 | Systems | Controller Design I | 02:59:48 - 03:59:42 (2024-12-01) || | ||||
184 | Engineering | Networks | Distributed Hash Table: Mapping of Peers into Multidimensional Space | 03:59:42 - 04:23:12 (2024-12-01) || | |||
185 | Engineering | Networks | Design for Multiple Services | 04:23:12 - 04:59:40 (2024-12-01) || | |||
186 | Engineering | 04:59:40 - 06:04:00 (2024-12-01) || | |||||
187 | Engineering | for mm Wave communication for 5G and beyond | estimation and Equalizer | 06:04:00 - 06:34:09 (2024-12-01) || | |||
188 | Engineering | for mm Wave communication for 5G and beyond | and MIMO | 06:34:09 - 07:03:24 (2024-12-01) || | |||
189 | Engineering | Electric vehicles: Technology & Economics | Battery? - Part 1 | 07:03:24 - 07:34:07 (2024-12-01) || | |||
190 | Engineering | Electric vehicles: Technology & Economics | Battery? - Part 2 | 07:34:07 - 08:00:00 (2024-12-01) || |
Swayam Prabha copyright © 2024 INFLIBNET Centre. All rights reserved.