No. | Subject | Course | Topic | User Category | Telecast Date / Day | Telecast Time | Repeat Time |
---|---|---|---|---|---|---|---|
1 | and equipment management | life and replacement analysis (Part 3) | 08:00:00 - 09:12:18 || | ||||
2 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 3 | 09:12:18 - 09:50:38 || | ||||
3 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 4 | 09:50:38 - 11:05:24 || | ||||
4 | CONNECTIONS IN STEEL STRUCTURES | 11:05:24 - 11:31:42 || | |||||
5 | (Hindi) | 11:31:42 - 12:00:00 || | |||||
6 | and equipment management | life and replacement analysis (Part 2) | 12:00:00 - 12:56:27 || | ||||
7 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 1 | 12:56:27 - 14:11:10 || | ||||
8 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 2 | 14:11:10 - 15:07:33 || | ||||
9 | CONNECTIONS IN STEEL STRUCTURES | Process | 15:07:33 - 15:26:05 || | ||||
10 | (Hindi) | 15:26:05 - 16:00:00 || | |||||
11 | and equipment management | life and replacement analysis (Part 1) | 16:00:00 - 17:26:35 || | ||||
12 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Landfills - Part 1 | 17:26:35 - 18:08:50 || | ||||
13 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Landfills - Part 2 | 18:08:50 - 18:59:39 || | ||||
14 | CONNECTIONS IN STEEL STRUCTURES | grip bolts in shear and design of bolts in tension | 18:59:39 - 19:32:47 || | ||||
15 | (Hindi) | 19:32:47 - 20:00:00 || | |||||
16 | and equipment management | cost estimation | 20:00:00 - 20:50:30 || | ||||
17 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | by Integrated Solid Waste Management (ISWM) | 20:50:30 - 21:32:58 || | ||||
18 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Waste Management (ISWM) - Case Studies | 21:32:58 - 22:11:30 || | ||||
19 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Landfilling | 22:11:30 - 23:08:55 || | ||||
20 | CONNECTIONS IN STEEL STRUCTURES | for bolts for long joints, long grip lengths, and thick packing plate | 23:08:55 - 23:32:27 || | ||||
21 | (Hindi) | 23:32:27 - 00:00:00 || | |||||
22 | and equipment management | cost of Equipment | 00:00:00 - 01:03:05 (2025-03-23) || | ||||
23 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Interaction | 01:03:05 - 02:18:16 (2025-03-23) || | ||||
24 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Generation and Disposal | 02:18:16 - 03:02:26 (2025-03-23) || | ||||
25 | CONNECTIONS IN STEEL STRUCTURES | type bolts in shear: Basic design principle | 03:02:26 - 03:32:30 (2025-03-23) || | ||||
26 | (Hindi) | 03:32:30 - 04:00:00 (2025-03-23) || | |||||
27 | and equipment management | Ownership cost (Average Annual Investment method) | 04:00:00 - 05:17:06 (2025-03-23) || | ||||
28 | and equipment management | Ownership cost (Time value method) | 05:17:06 - 06:06:41 (2025-03-23) || | ||||
29 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Contamination | 06:06:41 - 07:11:55 (2025-03-23) || | ||||
30 | CONNECTIONS IN STEEL STRUCTURES | techniques and clearances | 07:11:55 - 07:31:25 (2025-03-23) || | ||||
31 | (Hindi) | 07:31:25 - 08:00:00 (2025-03-23) || | |||||
32 | and equipment management | Fundamentals of Moving Earth | 08:00:00 - 09:26:39 || | ||||
33 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 1 | 09:26:39 - 10:15:54 || | ||||
34 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 2 | 10:15:54 - 11:07:03 || | ||||
35 | CONNECTIONS IN STEEL STRUCTURES | 11:07:03 - 11:31:59 || | |||||
36 | (Hindi) | 11:31:59 - 12:00:00 || | |||||
37 | and equipment management | life and replacement analysis (Part 3) | 12:00:00 - 13:12:18 || | ||||
38 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 3 | 13:12:18 - 13:50:38 || | ||||
39 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 4 | 13:50:38 - 15:05:24 || | ||||
40 | CONNECTIONS IN STEEL STRUCTURES | 15:05:24 - 15:31:42 || | |||||
41 | (Hindi) | 15:31:42 - 16:00:00 || | |||||
42 | and equipment management | life and replacement analysis (Part 2) | 16:00:00 - 16:56:27 || | ||||
43 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 1 | 16:56:27 - 18:11:10 || | ||||
44 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 2 | 18:11:10 - 19:07:33 || | ||||
45 | CONNECTIONS IN STEEL STRUCTURES | Process | 19:07:33 - 19:26:05 || | ||||
46 | (Hindi) | 19:26:05 - 20:00:00 || | |||||
47 | and equipment management | life and replacement analysis (Part 1) | 20:00:00 - 21:26:35 || | ||||
48 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Landfills - Part 1 | 21:26:35 - 22:08:50 || | ||||
49 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Landfills - Part 2 | 22:08:50 - 22:59:39 || | ||||
50 | CONNECTIONS IN STEEL STRUCTURES | grip bolts in shear and design of bolts in tension | 22:59:39 - 23:32:47 || | ||||
51 | (Hindi) | 23:32:47 - 00:00:00 || | |||||
52 | and equipment management | cost estimation | 00:00:00 - 00:50:30 (2025-03-25) || | ||||
53 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | by Integrated Solid Waste Management (ISWM) | 00:50:30 - 01:32:58 (2025-03-25) || | ||||
54 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Waste Management (ISWM) - Case Studies | 01:32:58 - 02:11:30 (2025-03-25) || | ||||
55 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Landfilling | 02:11:30 - 03:08:55 (2025-03-25) || | ||||
56 | CONNECTIONS IN STEEL STRUCTURES | for bolts for long joints, long grip lengths, and thick packing plate | 03:08:55 - 03:32:27 (2025-03-25) || | ||||
57 | (Hindi) | 03:32:27 - 04:00:00 (2025-03-25) || | |||||
58 | and equipment management | cost of Equipment | 04:00:00 - 05:03:05 (2025-03-25) || | ||||
59 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Interaction | 05:03:05 - 06:18:16 (2025-03-25) || | ||||
60 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Generation and Disposal | 06:18:16 - 07:02:26 (2025-03-25) || | ||||
61 | CONNECTIONS IN STEEL STRUCTURES | type bolts in shear: Basic design principle | 07:02:26 - 07:32:30 (2025-03-25) || | ||||
62 | (Hindi) | 07:32:30 - 08:00:00 (2025-03-25) || | |||||
63 | and equipment management | 08:00:00 - 09:48:05 || | |||||
64 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Control of Leachate | 09:48:05 - 10:57:00 || | ||||
65 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Control of Landfill Gas | 10:57:00 - 11:40:09 || | ||||
66 | CONNECTIONS IN STEEL STRUCTURES | 11:40:09 - 12:00:00 || | |||||
67 | and equipment management | Fundamentals of Moving Earth | 12:00:00 - 13:26:39 || | ||||
68 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 1 | 13:26:39 - 14:15:54 || | ||||
69 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 2 | 14:15:54 - 15:07:03 || | ||||
70 | CONNECTIONS IN STEEL STRUCTURES | 15:07:03 - 15:31:59 || | |||||
71 | (Hindi) | 15:31:59 - 16:00:00 || | |||||
72 | and equipment management | life and replacement analysis (Part 3) | 16:00:00 - 17:12:18 || | ||||
73 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 3 | 17:12:18 - 17:50:38 || | ||||
74 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 4 | 17:50:38 - 19:05:24 || | ||||
75 | CONNECTIONS IN STEEL STRUCTURES | 19:05:24 - 19:31:42 || | |||||
76 | (Hindi) | 19:31:42 - 20:00:00 || | |||||
77 | and equipment management | life and replacement analysis (Part 2) | 20:00:00 - 20:56:27 || | ||||
78 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 1 | 20:56:27 - 22:11:10 || | ||||
79 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 2 | 22:11:10 - 23:07:33 || | ||||
80 | CONNECTIONS IN STEEL STRUCTURES | Process | 23:07:33 - 23:26:05 || | ||||
81 | (Hindi) | 23:26:05 - 00:00:00 || | |||||
82 | and equipment management | life and replacement analysis (Part 1) | 00:00:00 - 01:26:35 (2025-03-26) || | ||||
83 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Landfills - Part 1 | 01:26:35 - 02:08:50 (2025-03-26) || | ||||
84 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Landfills - Part 2 | 02:08:50 - 02:59:39 (2025-03-26) || | ||||
85 | CONNECTIONS IN STEEL STRUCTURES | grip bolts in shear and design of bolts in tension | 02:59:39 - 03:32:47 (2025-03-26) || | ||||
86 | (Hindi) | 03:32:47 - 04:00:00 (2025-03-26) || | |||||
87 | and equipment management | cost estimation | 04:00:00 - 04:50:30 (2025-03-26) || | ||||
88 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | by Integrated Solid Waste Management (ISWM) | 04:50:30 - 05:32:58 (2025-03-26) || | ||||
89 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Waste Management (ISWM) - Case Studies | 05:32:58 - 06:11:30 (2025-03-26) || | ||||
90 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Landfilling | 06:11:30 - 07:08:55 (2025-03-26) || | ||||
91 | CONNECTIONS IN STEEL STRUCTURES | for bolts for long joints, long grip lengths, and thick packing plate | 07:08:55 - 07:32:27 (2025-03-26) || | ||||
92 | (Hindi) | 07:32:27 - 08:00:00 (2025-03-26) || | |||||
93 | and equipment management | Scrapers(Part 1) | 08:00:00 - 08:58:23 || | ||||
94 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 1 | 08:58:23 - 10:11:53 || | ||||
95 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Part 2 | 10:11:53 - 10:59:25 || | ||||
96 | CONNECTIONS IN STEEL STRUCTURES | defects, and filler material | 10:59:25 - 11:31:08 || | ||||
97 | (Hindi) | 11:31:08 - 12:00:00 || | |||||
98 | and equipment management | 12:00:00 - 13:48:05 || | |||||
99 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Control of Leachate | 13:48:05 - 14:57:00 || | ||||
100 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Control of Landfill Gas | 14:57:00 - 15:40:09 || | ||||
101 | CONNECTIONS IN STEEL STRUCTURES | 15:40:09 - 16:00:00 || | |||||
102 | and equipment management | Fundamentals of Moving Earth | 16:00:00 - 17:26:39 || | ||||
103 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 1 | 17:26:39 - 18:15:54 || | ||||
104 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 2 | 18:15:54 - 19:07:03 || | ||||
105 | CONNECTIONS IN STEEL STRUCTURES | 19:07:03 - 19:31:59 || | |||||
106 | (Hindi) | 19:31:59 - 20:00:00 || | |||||
107 | and equipment management | life and replacement analysis (Part 3) | 20:00:00 - 21:12:18 || | ||||
108 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 3 | 21:12:18 - 21:50:38 || | ||||
109 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 4 | 21:50:38 - 23:05:24 || | ||||
110 | CONNECTIONS IN STEEL STRUCTURES | 23:05:24 - 23:31:42 || | |||||
111 | (Hindi) | 23:31:42 - 00:00:00 || | |||||
112 | and equipment management | life and replacement analysis (Part 2) | 00:00:00 - 00:56:27 (2025-03-27) || | ||||
113 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 1 | 00:56:27 - 02:11:10 (2025-03-27) || | ||||
114 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 2 | 02:11:10 - 03:07:33 (2025-03-27) || | ||||
115 | CONNECTIONS IN STEEL STRUCTURES | Process | 03:07:33 - 03:26:05 (2025-03-27) || | ||||
116 | (Hindi) | 03:26:05 - 04:00:00 (2025-03-27) || | |||||
117 | and equipment management | life and replacement analysis (Part 1) | 04:00:00 - 05:26:35 (2025-03-27) || | ||||
118 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Landfills - Part 1 | 05:26:35 - 06:08:50 (2025-03-27) || | ||||
119 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Landfills - Part 2 | 06:08:50 - 06:59:39 (2025-03-27) || | ||||
120 | CONNECTIONS IN STEEL STRUCTURES | grip bolts in shear and design of bolts in tension | 06:59:39 - 07:32:47 (2025-03-27) || | ||||
121 | (Hindi) | 07:32:47 - 08:00:00 (2025-03-27) || | |||||
122 | and equipment management | Scrapers(Part 2) | 08:00:00 - 09:13:01 || | ||||
123 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Part 3 | 09:13:01 - 09:56:43 || | ||||
124 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Landfills | 09:56:43 - 10:54:15 || | ||||
125 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | 10:54:15 - 11:46:55 || | |||||
126 | CONNECTIONS IN STEEL STRUCTURES | welds | 11:46:55 - 12:00:00 || | ||||
127 | and equipment management | Scrapers(Part 1) | 12:00:00 - 12:58:23 || | ||||
128 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 1 | 12:58:23 - 14:11:53 || | ||||
129 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Part 2 | 14:11:53 - 14:59:25 || | ||||
130 | CONNECTIONS IN STEEL STRUCTURES | defects, and filler material | 14:59:25 - 15:31:08 || | ||||
131 | (Hindi) | 15:31:08 - 16:00:00 || | |||||
132 | and equipment management | 16:00:00 - 17:48:05 || | |||||
133 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Control of Leachate | 17:48:05 - 18:57:00 || | ||||
134 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Control of Landfill Gas | 18:57:00 - 19:40:09 || | ||||
135 | CONNECTIONS IN STEEL STRUCTURES | 19:40:09 - 20:00:00 || | |||||
136 | and equipment management | Fundamentals of Moving Earth | 20:00:00 - 21:26:39 || | ||||
137 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 1 | 21:26:39 - 22:15:54 || | ||||
138 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 2 | 22:15:54 - 23:07:03 || | ||||
139 | CONNECTIONS IN STEEL STRUCTURES | 23:07:03 - 23:31:59 || | |||||
140 | (Hindi) | 23:31:59 - 00:00:00 || | |||||
141 | and equipment management | life and replacement analysis (Part 3) | 00:00:00 - 01:12:18 (2025-03-28) || | ||||
142 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 3 | 01:12:18 - 01:50:38 (2025-03-28) || | ||||
143 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 4 | 01:50:38 - 03:05:24 (2025-03-28) || | ||||
144 | CONNECTIONS IN STEEL STRUCTURES | 03:05:24 - 03:31:42 (2025-03-28) || | |||||
145 | (Hindi) | 03:31:42 - 04:00:00 (2025-03-28) || | |||||
146 | and equipment management | life and replacement analysis (Part 2) | 04:00:00 - 04:56:27 (2025-03-28) || | ||||
147 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 1 | 04:56:27 - 06:11:10 (2025-03-28) || | ||||
148 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 2 | 06:11:10 - 07:07:33 (2025-03-28) || | ||||
149 | CONNECTIONS IN STEEL STRUCTURES | Process | 07:07:33 - 07:26:05 (2025-03-28) || | ||||
150 | (Hindi) | 07:26:05 - 08:00:00 (2025-03-28) || | |||||
151 | and equipment management | loaders | 08:00:00 - 08:43:28 || | ||||
152 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Monitoring Around Landfills - Part 1 | 08:43:28 - 09:55:39 || | ||||
153 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Monitoring Around Landfills - Part 2 | 09:55:39 - 10:50:28 || | ||||
154 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Components of Landfills | 10:50:28 - 11:28:22 || | ||||
155 | CONNECTIONS IN STEEL STRUCTURES | welds-1 | 11:28:22 - 12:00:00 || | ||||
156 | and equipment management | Scrapers(Part 2) | 12:00:00 - 13:13:01 || | ||||
157 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Part 3 | 13:13:01 - 13:56:43 || | ||||
158 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Landfills | 13:56:43 - 14:54:15 || | ||||
159 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | 14:54:15 - 15:46:55 || | |||||
160 | CONNECTIONS IN STEEL STRUCTURES | welds | 15:46:55 - 16:00:00 || | ||||
161 | and equipment management | Scrapers(Part 1) | 16:00:00 - 16:58:23 || | ||||
162 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 1 | 16:58:23 - 18:11:53 || | ||||
163 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Part 2 | 18:11:53 - 18:59:25 || | ||||
164 | CONNECTIONS IN STEEL STRUCTURES | defects, and filler material | 18:59:25 - 19:31:08 || | ||||
165 | (Hindi) | 19:31:08 - 20:00:00 || | |||||
166 | and equipment management | 20:00:00 - 21:48:05 || | |||||
167 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Control of Leachate | 21:48:05 - 22:57:00 || | ||||
168 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Control of Landfill Gas | 22:57:00 - 23:40:09 || | ||||
169 | CONNECTIONS IN STEEL STRUCTURES | 23:40:09 - 00:00:00 || | |||||
170 | and equipment management | Fundamentals of Moving Earth | 00:00:00 - 01:26:39 (2025-03-29) || | ||||
171 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 1 | 01:26:39 - 02:15:54 (2025-03-29) || | ||||
172 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 2 | 02:15:54 - 03:07:03 (2025-03-29) || | ||||
173 | CONNECTIONS IN STEEL STRUCTURES | 03:07:03 - 03:31:59 (2025-03-29) || | |||||
174 | (Hindi) | 03:31:59 - 04:00:00 (2025-03-29) || | |||||
175 | and equipment management | life and replacement analysis (Part 3) | 04:00:00 - 05:12:18 (2025-03-29) || | ||||
176 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 3 | 05:12:18 - 05:50:38 (2025-03-29) || | ||||
177 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | - Part 4 | 05:50:38 - 07:05:24 (2025-03-29) || | ||||
178 | CONNECTIONS IN STEEL STRUCTURES | 07:05:24 - 07:31:42 (2025-03-29) || | |||||
179 | (Hindi) | 07:31:42 - 08:00:00 (2025-03-29) || |
Swayam Prabha copyright © 2024 INFLIBNET Centre. All rights reserved.