No. | Subject | Course | Topic | User Category | Telecast Date / Day | Telecast Time | Repeat Time |
---|---|---|---|---|---|---|---|
1 | of Rigid Pavements | 08:00:00 - 09:05:49 || | |||||
2 | Engineering | of fluid mechanics- I | 09:05:49 - 09:48:36 || | ||||
3 | Engineering | Introduction | 09:48:36 - 10:44:42 || | ||||
4 | Geology | Introduction and significance | 10:44:42 - 11:17:40 || | ||||
5 | Foundation Engineering | Introduction and Soil Exploration I | 11:17:40 - 12:00:00 || | ||||
6 | and equipment management | 12:00:00 - 12:15:05 || | |||||
7 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | of Waste Materials- Part 1 | 12:15:05 - 13:10:48 || | ||||
8 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | of Waste Materials- Part 2 | 13:10:48 - 14:04:54 || | ||||
9 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Review | 14:04:54 - 14:48:42 || | ||||
10 | CONNECTIONS IN STEEL STRUCTURES | beam-column connections-1 | 14:48:42 - 15:32:43 || | ||||
11 | CONNECTIONS IN STEEL STRUCTURES | beam-column connections-2 | 15:32:43 - 16:00:00 || | ||||
12 | and equipment management | Equipment (Part 2) | 16:00:00 - 18:13:54 || | ||||
13 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Control at Slurry Ponds | 18:13:54 - 18:58:48 || | ||||
14 | CONNECTIONS IN STEEL STRUCTURES | connection: Design example | 18:58:48 - 19:39:41 || | ||||
15 | CONNECTIONS IN STEEL STRUCTURES | connection | 19:39:41 - 20:00:00 || | ||||
16 | and equipment management | 2) | 20:00:00 - 21:10:00 || | ||||
17 | and equipment management | Equipment (Part 1) | 21:10:00 - 22:18:08 || | ||||
18 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Incrementally Raised Embankments- Part 2 | 22:18:08 - 23:03:31 || | ||||
19 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | for Slope Failures in Embankments / Dykes of Slurry Ponds | 23:03:31 - 23:43:58 || | ||||
20 | CONNECTIONS IN STEEL STRUCTURES | connection: Introduction | 23:43:58 - 00:00:00 || | ||||
21 | and equipment management | Pile driving equipment (Part 2) | 00:00:00 - 00:49:34 (2025-04-08) || | ||||
22 | and equipment management | 1) | 00:49:34 - 01:36:49 (2025-04-08) || | ||||
23 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Slurry Ponds | 01:36:49 - 02:33:23 (2025-04-08) || | ||||
24 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Incrementally Raised Embankments- Part 1 | 02:33:23 - 03:16:25 (2025-04-08) || | ||||
25 | CONNECTIONS IN STEEL STRUCTURES | angle connections | 03:16:25 - 03:41:10 (2025-04-08) || | ||||
26 | CONNECTIONS IN STEEL STRUCTURES | angle connections | 03:41:10 - 04:00:00 (2025-04-08) || | ||||
27 | and equipment management | Pile driving equipment (Part 1) | 04:00:00 - 04:55:36 (2025-04-08) || | ||||
28 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Waste in Ponds & Impoundments and Dry Waste in Mounds | 04:55:36 - 05:49:19 (2025-04-08) || | ||||
29 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Properties of Coal Ash & Mine Tailings - Part 1 | 05:49:19 - 06:30:18 (2025-04-08) || | ||||
30 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Properties of Coal Ash & Mine Tailings - Part 2 | 06:30:18 - 07:24:31 (2025-04-08) || | ||||
31 | CONNECTIONS IN STEEL STRUCTURES | frame connections | 07:24:31 - 08:00:00 (2025-04-08) || | ||||
32 | of Rigid Pavements | of Rigid Pavements | 08:00:00 - 09:15:48 || | ||||
33 | Engineering | of fluid mechanics- I (Contd.) | 09:15:48 - 09:50:21 || | ||||
34 | Engineering | of fluid mechanics- I (Contd.) | 09:50:21 - 10:36:01 || | ||||
35 | Engineering | and Definition of Soils | 10:36:01 - 11:22:46 || | ||||
36 | Geology | Enginnering geological ground, concept and categorization | 11:22:46 - 12:00:00 || | ||||
37 | of Rigid Pavements | 12:00:00 - 13:05:49 || | |||||
38 | Engineering | of fluid mechanics- I | 13:05:49 - 13:48:36 || | ||||
39 | Engineering | Introduction | 13:48:36 - 14:44:42 || | ||||
40 | Geology | Introduction and significance | 14:44:42 - 15:17:40 || | ||||
41 | Foundation Engineering | Introduction and Soil Exploration I | 15:17:40 - 16:00:00 || | ||||
42 | and equipment management | 16:00:00 - 16:15:05 || | |||||
43 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | of Waste Materials- Part 1 | 16:15:05 - 17:10:48 || | ||||
44 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | of Waste Materials- Part 2 | 17:10:48 - 18:04:54 || | ||||
45 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Review | 18:04:54 - 18:48:42 || | ||||
46 | CONNECTIONS IN STEEL STRUCTURES | beam-column connections-1 | 18:48:42 - 19:32:43 || | ||||
47 | CONNECTIONS IN STEEL STRUCTURES | beam-column connections-2 | 19:32:43 - 20:00:00 || | ||||
48 | and equipment management | Equipment (Part 2) | 20:00:00 - 22:13:54 || | ||||
49 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Control at Slurry Ponds | 22:13:54 - 22:58:48 || | ||||
50 | CONNECTIONS IN STEEL STRUCTURES | connection: Design example | 22:58:48 - 23:39:41 || | ||||
51 | CONNECTIONS IN STEEL STRUCTURES | connection | 23:39:41 - 00:00:00 || | ||||
52 | and equipment management | 2) | 00:00:00 - 01:10:00 (2025-04-09) || | ||||
53 | and equipment management | Equipment (Part 1) | 01:10:00 - 02:18:08 (2025-04-09) || | ||||
54 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Incrementally Raised Embankments- Part 2 | 02:18:08 - 03:03:31 (2025-04-09) || | ||||
55 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | for Slope Failures in Embankments / Dykes of Slurry Ponds | 03:03:31 - 03:43:58 (2025-04-09) || | ||||
56 | CONNECTIONS IN STEEL STRUCTURES | connection: Introduction | 03:43:58 - 04:00:00 (2025-04-09) || | ||||
57 | and equipment management | Pile driving equipment (Part 2) | 04:00:00 - 04:49:34 (2025-04-09) || | ||||
58 | and equipment management | 1) | 04:49:34 - 05:36:49 (2025-04-09) || | ||||
59 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Slurry Ponds | 05:36:49 - 06:33:23 (2025-04-09) || | ||||
60 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Incrementally Raised Embankments- Part 1 | 06:33:23 - 07:16:25 (2025-04-09) || | ||||
61 | CONNECTIONS IN STEEL STRUCTURES | angle connections | 07:16:25 - 07:41:10 (2025-04-09) || | ||||
62 | CONNECTIONS IN STEEL STRUCTURES | angle connections | 07:41:10 - 08:00:00 (2025-04-09) || | ||||
63 | of Rigid Pavements | Pavements- Finite Element Method | 08:00:00 - 09:08:18 || | ||||
64 | Engineering | of fluid mechanics- I (Contd.) | 09:08:18 - 09:46:18 || | ||||
65 | Engineering | Classification of Soils- I | 09:46:18 - 11:04:51 || | ||||
66 | Geology | Geomaterial :Rock, rock material and rock strata, concept of stress, deformation....... | 11:04:51 - 12:00:00 || | ||||
67 | of Rigid Pavements | of Rigid Pavements | 12:00:00 - 13:15:48 || | ||||
68 | Engineering | of fluid mechanics- I (Contd.) | 13:15:48 - 13:50:21 || | ||||
69 | Engineering | of fluid mechanics- I (Contd.) | 13:50:21 - 14:36:01 || | ||||
70 | Engineering | and Definition of Soils | 14:36:01 - 15:22:46 || | ||||
71 | Geology | Enginnering geological ground, concept and categorization | 15:22:46 - 16:00:00 || | ||||
72 | of Rigid Pavements | 16:00:00 - 17:05:49 || | |||||
73 | Engineering | of fluid mechanics- I | 17:05:49 - 17:48:36 || | ||||
74 | Engineering | Introduction | 17:48:36 - 18:44:42 || | ||||
75 | Geology | Introduction and significance | 18:44:42 - 19:17:40 || | ||||
76 | Foundation Engineering | Introduction and Soil Exploration I | 19:17:40 - 20:00:00 || | ||||
77 | and equipment management | 20:00:00 - 20:15:05 || | |||||
78 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | of Waste Materials- Part 1 | 20:15:05 - 21:10:48 || | ||||
79 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | of Waste Materials- Part 2 | 21:10:48 - 22:04:54 || | ||||
80 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Review | 22:04:54 - 22:48:42 || | ||||
81 | CONNECTIONS IN STEEL STRUCTURES | beam-column connections-1 | 22:48:42 - 23:32:43 || | ||||
82 | CONNECTIONS IN STEEL STRUCTURES | beam-column connections-2 | 23:32:43 - 00:00:00 || | ||||
83 | and equipment management | Equipment (Part 2) | 00:00:00 - 02:13:54 (2025-04-10) || | ||||
84 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Control at Slurry Ponds | 02:13:54 - 02:58:48 (2025-04-10) || | ||||
85 | CONNECTIONS IN STEEL STRUCTURES | connection: Design example | 02:58:48 - 03:39:41 (2025-04-10) || | ||||
86 | CONNECTIONS IN STEEL STRUCTURES | connection | 03:39:41 - 04:00:00 (2025-04-10) || | ||||
87 | and equipment management | 2) | 04:00:00 - 05:10:00 (2025-04-10) || | ||||
88 | and equipment management | Equipment (Part 1) | 05:10:00 - 06:18:08 (2025-04-10) || | ||||
89 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Incrementally Raised Embankments- Part 2 | 06:18:08 - 07:03:31 (2025-04-10) || | ||||
90 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | for Slope Failures in Embankments / Dykes of Slurry Ponds | 07:03:31 - 07:43:58 (2025-04-10) || | ||||
91 | CONNECTIONS IN STEEL STRUCTURES | connection: Introduction | 07:43:58 - 08:00:00 (2025-04-10) || | ||||
92 | of Rigid Pavements | Pavements | 08:00:00 - 09:08:29 || | ||||
93 | Engineering | of fluid mechanics- I (Contd.) | 09:08:29 - 09:52:49 || | ||||
94 | Engineering | Classification of Soils- II | 09:52:49 - 10:50:38 || | ||||
95 | Geology | Stress-strain behaviour and mechanical parameters of rocks | 10:50:38 - 11:30:14 || | ||||
96 | Foundation Engineering | Exploration - II | 11:30:14 - 12:00:00 || | ||||
97 | of Rigid Pavements | Pavements- Finite Element Method | 12:00:00 - 13:08:18 || | ||||
98 | Engineering | of fluid mechanics- I (Contd.) | 13:08:18 - 13:46:18 || | ||||
99 | Engineering | Classification of Soils- I | 13:46:18 - 15:04:51 || | ||||
100 | Geology | Geomaterial :Rock, rock material and rock strata, concept of stress, deformation....... | 15:04:51 - 16:00:00 || | ||||
101 | of Rigid Pavements | of Rigid Pavements | 16:00:00 - 17:15:48 || | ||||
102 | Engineering | of fluid mechanics- I (Contd.) | 17:15:48 - 17:50:21 || | ||||
103 | Engineering | of fluid mechanics- I (Contd.) | 17:50:21 - 18:36:01 || | ||||
104 | Engineering | and Definition of Soils | 18:36:01 - 19:22:46 || | ||||
105 | Geology | Enginnering geological ground, concept and categorization | 19:22:46 - 20:00:00 || | ||||
106 | of Rigid Pavements | 20:00:00 - 21:05:49 || | |||||
107 | Engineering | of fluid mechanics- I | 21:05:49 - 21:48:36 || | ||||
108 | Engineering | Introduction | 21:48:36 - 22:44:42 || | ||||
109 | Geology | Introduction and significance | 22:44:42 - 23:17:40 || | ||||
110 | Foundation Engineering | Introduction and Soil Exploration I | 23:17:40 - 00:00:00 || | ||||
111 | and equipment management | 00:00:00 - 00:15:05 (2025-04-11) || | |||||
112 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | of Waste Materials- Part 1 | 00:15:05 - 01:10:48 (2025-04-11) || | ||||
113 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | of Waste Materials- Part 2 | 01:10:48 - 02:04:54 (2025-04-11) || | ||||
114 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Review | 02:04:54 - 02:48:42 (2025-04-11) || | ||||
115 | CONNECTIONS IN STEEL STRUCTURES | beam-column connections-1 | 02:48:42 - 03:32:43 (2025-04-11) || | ||||
116 | CONNECTIONS IN STEEL STRUCTURES | beam-column connections-2 | 03:32:43 - 04:00:00 (2025-04-11) || | ||||
117 | and equipment management | Equipment (Part 2) | 04:00:00 - 06:13:54 (2025-04-11) || | ||||
118 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Control at Slurry Ponds | 06:13:54 - 06:58:48 (2025-04-11) || | ||||
119 | CONNECTIONS IN STEEL STRUCTURES | connection: Design example | 06:58:48 - 07:39:41 (2025-04-11) || | ||||
120 | CONNECTIONS IN STEEL STRUCTURES | connection | 07:39:41 - 08:00:00 (2025-04-11) || | ||||
121 | of Rigid Pavements | 08:00:00 - 09:03:09 || | |||||
122 | Engineering | of fluid mechanics- II | 09:03:09 - 09:45:39 || | ||||
123 | Engineering | Classification of Soils- III and Challenging Situations | 09:45:39 - 10:43:22 || | ||||
124 | Geology | Geomorphology of river valley and mountainous regions and landforms | 10:43:22 - 11:25:50 || | ||||
125 | Foundation Engineering | Exploration - III | 11:25:50 - 12:00:00 || | ||||
126 | of Rigid Pavements | Pavements | 12:00:00 - 13:08:29 || | ||||
127 | Engineering | of fluid mechanics- I (Contd.) | 13:08:29 - 13:52:49 || | ||||
128 | Engineering | Classification of Soils- II | 13:52:49 - 14:50:38 || | ||||
129 | Geology | Stress-strain behaviour and mechanical parameters of rocks | 14:50:38 - 15:30:14 || | ||||
130 | Foundation Engineering | Exploration - II | 15:30:14 - 16:00:00 || | ||||
131 | of Rigid Pavements | Pavements- Finite Element Method | 16:00:00 - 17:08:18 || | ||||
132 | Engineering | of fluid mechanics- I (Contd.) | 17:08:18 - 17:46:18 || | ||||
133 | Engineering | Classification of Soils- I | 17:46:18 - 19:04:51 || | ||||
134 | Geology | Geomaterial :Rock, rock material and rock strata, concept of stress, deformation....... | 19:04:51 - 20:00:00 || | ||||
135 | of Rigid Pavements | of Rigid Pavements | 20:00:00 - 21:15:48 || | ||||
136 | Engineering | of fluid mechanics- I (Contd.) | 21:15:48 - 21:50:21 || | ||||
137 | Engineering | of fluid mechanics- I (Contd.) | 21:50:21 - 22:36:01 || | ||||
138 | Engineering | and Definition of Soils | 22:36:01 - 23:22:46 || | ||||
139 | Geology | Enginnering geological ground, concept and categorization | 23:22:46 - 00:00:00 || | ||||
140 | of Rigid Pavements | 00:00:00 - 01:05:49 (2025-04-12) || | |||||
141 | Engineering | of fluid mechanics- I | 01:05:49 - 01:48:36 (2025-04-12) || | ||||
142 | Engineering | Introduction | 01:48:36 - 02:44:42 (2025-04-12) || | ||||
143 | Geology | Introduction and significance | 02:44:42 - 03:17:40 (2025-04-12) || | ||||
144 | Foundation Engineering | Introduction and Soil Exploration I | 03:17:40 - 04:00:00 (2025-04-12) || | ||||
145 | and equipment management | 04:00:00 - 04:15:05 (2025-04-12) || | |||||
146 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | of Waste Materials- Part 1 | 04:15:05 - 05:10:48 (2025-04-12) || | ||||
147 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | of Waste Materials- Part 2 | 05:10:48 - 06:04:54 (2025-04-12) || | ||||
148 | Engineering (Environmental Geotechnology): Landfills, Slurry Ponds & Contaminated Sites | Review | 06:04:54 - 06:48:42 (2025-04-12) || | ||||
149 | CONNECTIONS IN STEEL STRUCTURES | beam-column connections-1 | 06:48:42 - 07:32:43 (2025-04-12) || | ||||
150 | CONNECTIONS IN STEEL STRUCTURES | beam-column connections-2 | 07:32:43 - 08:00:00 (2025-04-12) || | ||||
151 | of Rigid Pavements | Solutions (Part 1) | 08:00:00 - 09:10:52 || | ||||
152 | Engineering | of fluid mechanics- II (Contd.) | 09:10:52 - 09:42:42 || | ||||
153 | Engineering | constituents- I | 09:42:42 - 10:43:28 || | ||||
154 | Geology | Different types of water and distribution of water, different type of rocks and....... | 10:43:28 - 11:28:53 || | ||||
155 | Foundation Engineering | Exploration - IV | 11:28:53 - 12:00:00 || | ||||
156 | of Rigid Pavements | 12:00:00 - 13:03:09 || | |||||
157 | Engineering | of fluid mechanics- II | 13:03:09 - 13:45:39 || | ||||
158 | Engineering | Classification of Soils- III and Challenging Situations | 13:45:39 - 14:43:22 || | ||||
159 | Geology | Geomorphology of river valley and mountainous regions and landforms | 14:43:22 - 15:25:50 || | ||||
160 | Foundation Engineering | Exploration - III | 15:25:50 - 16:00:00 || | ||||
161 | of Rigid Pavements | Pavements | 16:00:00 - 17:08:29 || | ||||
162 | Engineering | of fluid mechanics- I (Contd.) | 17:08:29 - 17:52:49 || | ||||
163 | Engineering | Classification of Soils- II | 17:52:49 - 18:50:38 || | ||||
164 | Geology | Stress-strain behaviour and mechanical parameters of rocks | 18:50:38 - 19:30:14 || | ||||
165 | Foundation Engineering | Exploration - II | 19:30:14 - 20:00:00 || | ||||
166 | of Rigid Pavements | Pavements- Finite Element Method | 20:00:00 - 21:08:18 || | ||||
167 | Engineering | of fluid mechanics- I (Contd.) | 21:08:18 - 21:46:18 || | ||||
168 | Engineering | Classification of Soils- I | 21:46:18 - 23:04:51 || | ||||
169 | Geology | Geomaterial :Rock, rock material and rock strata, concept of stress, deformation....... | 23:04:51 - 00:00:00 || | ||||
170 | of Rigid Pavements | of Rigid Pavements | 00:00:00 - 01:15:48 (2025-04-13) || | ||||
171 | Engineering | of fluid mechanics- I (Contd.) | 01:15:48 - 01:50:21 (2025-04-13) || | ||||
172 | Engineering | of fluid mechanics- I (Contd.) | 01:50:21 - 02:36:01 (2025-04-13) || | ||||
173 | Engineering | and Definition of Soils | 02:36:01 - 03:22:46 (2025-04-13) || | ||||
174 | Geology | Enginnering geological ground, concept and categorization | 03:22:46 - 04:00:00 (2025-04-13) || | ||||
175 | of Rigid Pavements | 04:00:00 - 05:05:49 (2025-04-13) || | |||||
176 | Engineering | of fluid mechanics- I | 05:05:49 - 05:48:36 (2025-04-13) || | ||||
177 | Engineering | Introduction | 05:48:36 - 06:44:42 (2025-04-13) || | ||||
178 | Geology | Introduction and significance | 06:44:42 - 07:17:40 (2025-04-13) || | ||||
179 | Foundation Engineering | Introduction and Soil Exploration I | 07:17:40 - 08:00:00 (2025-04-13) || |